Time & Work & Wages Test 20
Bilingual timed test for SSC, RRB and Banking quant with clean Hindi, preserved math symbols and detailed solutions.
Time & Work & Wages Test 20
25 bilingual MCQs from Time & Work & Wages, including 5 fresh LearnAtMyPlace original supplemental questions with detailed solutions. Designed for cross-exam quantitative aptitude practice with preserved ₹, ×, %, ratios and Hindi wording.
Question Palette Legend
Preview all 25 questions in Time & Work & Wages Test 20 (no login required)
- Time & Work & Wages — Mains level join-leave
1. A, B and C can finish a work in 16, 21, 31 days. A and B work together for 6 days, then C also joins. How many more days are needed? / A, B, C काम को 16, 21, 31 दिनों में करते हैं। A और B 6 दिन साथ काम करते हैं, फिर C जुड़ता है। और कितने दिन लगेंगे?
- A. 3534/1483 days (Correct)
- B. 6500/1483 days
- C. 5017/1483 days
- D. 2051/1483 days
Explanation: A+B do 37/56 work in 6 days. Remaining=19/56. A+B+C rate=1483/10416 per day. Extra time=3534/1483 days. / A+B ने 6 दिनों में 37/56 काम किया। शेष=19/56. A+B+C की दर=1483/10416 प्रति दिन। अतिरिक्त समय=3534/1483 days.
- Time & Work & Wages — Mains level join-leave
2. A, B and C can finish a work in 17, 22, 32 days. A and B work together for 7 days, then C also joins. How many more days are needed? / A, B, C काम को 17, 22, 32 दिनों में करते हैं। A और B 7 दिन साथ काम करते हैं, फिर C जुड़ता है। और कितने दिन लगेंगे?
- A. 3238/811 days
- B. 1616/811 days (Correct)
- C. 1 days
- D. 2427/811 days
Explanation: A+B do 273/374 work in 7 days. Remaining=101/374. A+B+C rate=811/5984 per day. Extra time=1616/811 days. / A+B ने 7 दिनों में 273/374 काम किया। शेष=101/374. A+B+C की दर=811/5984 प्रति दिन। अतिरिक्त समय=1616/811 days.
- Time & Work & Wages — Mains level join-leave
3. A, B and C can finish a work in 18, 23, 33 days. A and B work together for 8 days, then C also joins. How many more days are needed? / A, B, C काम को 18, 23, 33 दिनों में करते हैं। A और B 8 दिन साथ काम करते हैं, फिर C जुड़ता है। और कितने दिन लगेंगे?
- A. 1 days
- B. 1535/589 days
- C. 946/589 days (Correct)
- D. 2124/589 days
Explanation: A+B do 164/207 work in 8 days. Remaining=43/207. A+B+C rate=589/4554 per day. Extra time=946/589 days. / A+B ने 8 दिनों में 164/207 काम किया। शेष=43/207. A+B+C की दर=589/4554 प्रति दिन। अतिरिक्त समय=946/589 days.
- Time & Work & Wages — Efficiency percent relation
4. A alone takes 20 days. B is 25% more efficient than A. Find the time taken by A and B together. / A अकेला 20 दिन लेता है। B, A से 25% अधिक दक्ष है। A और B साथ मिलकर समय ज्ञात करें।
- A. 98/9 days
- B. 80/9 days (Correct)
- C. 71/9 days
- D. 89/9 days
Explanation: B's time = 80% of A's time = 16 days. Together time = 20×16/(20+16) = 80/9 days. / B का समय A का 80% = 16 दिन। साथ में समय = 20×16/(20+16) = 80/9 days.
- Time & Work & Wages — Efficiency percent relation
5. A alone takes 21 days. B is 25% more efficient than A. Find the time taken by A and B together. / A अकेला 21 दिन लेता है। B, A से 25% अधिक दक्ष है। A और B साथ मिलकर समय ज्ञात करें।
- A. 299/37 days
- B. 410/37 days
- C. 336/37 days (Correct)
- D. 373/37 days
Explanation: B's time = 80% of A's time = 16 days. Together time = 21×16/(21+16) = 336/37 days. / B का समय A का 80% = 16 दिन। साथ में समय = 21×16/(21+16) = 336/37 days.
- Time & Work & Wages — Efficiency percent relation
6. A alone takes 22 days. B is 25% more efficient than A. Find the time taken by A and B together. / A अकेला 22 दिन लेता है। B, A से 25% अधिक दक्ष है। A और B साथ मिलकर समय ज्ञात करें।
- A. 413/39 days
- B. 335/39 days
- C. 374/39 days (Correct)
- D. 452/39 days
Explanation: B's time = 80% of A's time = 17 days. Together time = 22×17/(22+17) = 374/39 days. / B का समय A का 80% = 17 दिन। साथ में समय = 22×17/(22+17) = 374/39 days.
- Time & Work & Wages — Work-wage PO level
7. A and B can complete a job in 15 and 25 days. They work together for 6 days and receive ₹1900. Find A's wage. / A और B काम को 15 और 25 दिनों में करते हैं। वे 6 दिन साथ काम करते हैं और ₹1900 पाते हैं। A की मजदूरी ज्ञात करें।
- A. ₹1388
- B. ₹1088
- C. ₹1288
- D. ₹1188 (Correct)
Explanation: Work ratio A:B = 6/15:6/25 = 25:15. A's wage = 1900×25/(40) = 1188. / काम अनुपात A:B = 6/15:6/25 = 25:15. A का वेतन = 1900×25/40 = 1188.
- Time & Work & Wages — Work-wage PO level
8. A and B can complete a job in 16 and 26 days. They work together for 3 days and receive ₹2000. Find A's wage. / A और B काम को 16 और 26 दिनों में करते हैं। वे 3 दिन साथ काम करते हैं और ₹2000 पाते हैं। A की मजदूरी ज्ञात करें।
- A. ₹1238 (Correct)
- B. ₹1338
- C. ₹1438
- D. ₹1138
Explanation: Work ratio A:B = 3/16:3/26 = 26:16. A's wage = 2000×26/(42) = 1238. / काम अनुपात A:B = 3/16:3/26 = 26:16. A का वेतन = 2000×26/42 = 1238.
- Time & Work & Wages — Work-wage PO level
9. A and B can complete a job in 17 and 27 days. They work together for 4 days and receive ₹2100. Find A's wage. / A और B काम को 17 और 27 दिनों में करते हैं। वे 4 दिन साथ काम करते हैं और ₹2100 पाते हैं। A की मजदूरी ज्ञात करें।
- A. ₹1289 (Correct)
- B. ₹1189
- C. ₹1389
- D. ₹1489
Explanation: Work ratio A:B = 4/17:4/27 = 27:17. A's wage = 2100×27/(44) = 1289. / काम अनुपात A:B = 4/17:4/27 = 27:17. A का वेतन = 2100×27/44 = 1289.
- Time & Work & Wages — Work-wage PO level
10. A and B can complete a job in 18 and 18 days. They work together for 5 days and receive ₹2200. Find A's wage. / A और B काम को 18 और 18 दिनों में करते हैं। वे 5 दिन साथ काम करते हैं और ₹2200 पाते हैं। A की मजदूरी ज्ञात करें।
- A. ₹1100 (Correct)
- B. ₹1000
- C. ₹1200
- D. ₹1300
Explanation: Work ratio A:B = 5/18:5/18 = 18:18. A's wage = 2200×18/(36) = 1100. / काम अनुपात A:B = 5/18:5/18 = 18:18. A का वेतन = 2200×18/36 = 1100.
- Time & Work & Wages — Mains level join-leave
11. A, B and C can finish a work in 16, 21, 31 days. A and B work together for 6 days, then C also joins. How many more days are needed? / A, B, C काम को 16, 21, 31 दिनों में करते हैं। A और B 6 दिन साथ काम करते हैं, फिर C जुड़ता है। और कितने दिन लगेंगे?
- A. 3534/1483 days (Correct)
- B. 6500/1483 days
- C. 5017/1483 days
- D. 2051/1483 days
Explanation: A+B do 37/56 work in 6 days. Remaining=19/56. A+B+C rate=1483/10416 per day. Extra time=3534/1483 days. / A+B ने 6 दिनों में 37/56 काम किया। शेष=19/56. A+B+C की दर=1483/10416 प्रति दिन। अतिरिक्त समय=3534/1483 days.
- Time & Work & Wages — Mains level join-leave
12. A, B and C can finish a work in 17, 22, 32 days. A and B work together for 7 days, then C also joins. How many more days are needed? / A, B, C काम को 17, 22, 32 दिनों में करते हैं। A और B 7 दिन साथ काम करते हैं, फिर C जुड़ता है। और कितने दिन लगेंगे?
- A. 3238/811 days
- B. 1616/811 days (Correct)
- C. 1 days
- D. 2427/811 days
Explanation: A+B do 273/374 work in 7 days. Remaining=101/374. A+B+C rate=811/5984 per day. Extra time=1616/811 days. / A+B ने 7 दिनों में 273/374 काम किया। शेष=101/374. A+B+C की दर=811/5984 प्रति दिन। अतिरिक्त समय=1616/811 days.
- Time & Work & Wages — Mains level join-leave
13. A, B and C can finish a work in 18, 23, 33 days. A and B work together for 8 days, then C also joins. How many more days are needed? / A, B, C काम को 18, 23, 33 दिनों में करते हैं। A और B 8 दिन साथ काम करते हैं, फिर C जुड़ता है। और कितने दिन लगेंगे?
- A. 946/589 days (Correct)
- B. 2124/589 days
- C. 1535/589 days
- D. 1 days
Explanation: A+B do 164/207 work in 8 days. Remaining=43/207. A+B+C rate=589/4554 per day. Extra time=946/589 days. / A+B ने 8 दिनों में 164/207 काम किया। शेष=43/207. A+B+C की दर=589/4554 प्रति दिन। अतिरिक्त समय=946/589 days.
- Time & Work & Wages — Efficiency percent relation
14. A alone takes 30 days. B is 25% more efficient than A. Find the time taken by A and B together. / A अकेला 30 दिन लेता है। B, A से 25% अधिक दक्ष है। A और B साथ मिलकर समय ज्ञात करें।
- A. 40/3 days (Correct)
- B. 37/3 days
- C. 46/3 days
- D. 43/3 days
Explanation: B's time = 80% of A's time = 24 days. Together time = 30×24/(30+24) = 40/3 days. / B का समय A का 80% = 24 दिन। साथ में समय = 30×24/(30+24) = 40/3 days.
- Time & Work & Wages — Efficiency percent relation
15. A alone takes 31 days. B is 25% more efficient than A. Find the time taken by A and B together. / A अकेला 31 दिन लेता है। B, A से 25% अधिक दक्ष है। A और B साथ मिलकर समय ज्ञात करें।
- A. 854/55 days
- B. 689/55 days
- C. 744/55 days (Correct)
- D. 799/55 days
Explanation: B's time = 80% of A's time = 24 days. Together time = 31×24/(31+24) = 744/55 days. / B का समय A का 80% = 24 दिन। साथ में समय = 31×24/(31+24) = 744/55 days.
- Time & Work & Wages — Efficiency percent relation
16. A alone takes 20 days. B is 25% more efficient than A. Find the time taken by A and B together. / A अकेला 20 दिन लेता है। B, A से 25% अधिक दक्ष है। A और B साथ मिलकर समय ज्ञात करें।
- A. 80/9 days (Correct)
- B. 98/9 days
- C. 71/9 days
- D. 89/9 days
Explanation: B's time = 80% of A's time = 16 days. Together time = 20×16/(20+16) = 80/9 days. / B का समय A का 80% = 16 दिन। साथ में समय = 20×16/(20+16) = 80/9 days.
- Time & Work & Wages — Work-wage PO level
17. A and B can complete a job in 17 and 25 days. They work together for 4 days and receive ₹2900. Find A's wage. / A और B काम को 17 और 25 दिनों में करते हैं। वे 4 दिन साथ काम करते हैं और ₹2900 पाते हैं। A की मजदूरी ज्ञात करें।
- A. ₹1626
- B. ₹1926
- C. ₹1726 (Correct)
- D. ₹1826
Explanation: Work ratio A:B = 4/17:4/25 = 25:17. A's wage = 2900×25/(42) = 1726. / काम अनुपात A:B = 4/17:4/25 = 25:17. A का वेतन = 2900×25/42 = 1726.
- Time & Work & Wages — Work-wage PO level
18. A and B can complete a job in 18 and 26 days. They work together for 5 days and receive ₹3000. Find A's wage. / A और B काम को 18 और 26 दिनों में करते हैं। वे 5 दिन साथ काम करते हैं और ₹3000 पाते हैं। A की मजदूरी ज्ञात करें।
- A. ₹1873
- B. ₹1973
- C. ₹1673
- D. ₹1773 (Correct)
Explanation: Work ratio A:B = 5/18:5/26 = 26:18. A's wage = 3000×26/(44) = 1773. / काम अनुपात A:B = 5/18:5/26 = 26:18. A का वेतन = 3000×26/44 = 1773.
- Time & Work & Wages — Work-wage PO level
19. A and B can complete a job in 19 and 27 days. They work together for 6 days and receive ₹3100. Find A's wage. / A और B काम को 19 और 27 दिनों में करते हैं। वे 6 दिन साथ काम करते हैं और ₹3100 पाते हैं। A की मजदूरी ज्ञात करें।
- A. ₹1720
- B. ₹2020
- C. ₹1920
- D. ₹1820 (Correct)
Explanation: Work ratio A:B = 6/19:6/27 = 27:19. A's wage = 3100×27/(46) = 1820. / काम अनुपात A:B = 6/19:6/27 = 27:19. A का वेतन = 3100×27/46 = 1820.
- Time & Work & Wages — Work-wage PO level
20. A and B can complete a job in 12 and 18 days. They work together for 3 days and receive ₹1200. Find A's wage. / A और B काम को 12 और 18 दिनों में करते हैं। वे 3 दिन साथ काम करते हैं और ₹1200 पाते हैं। A की मजदूरी ज्ञात करें।
- A. ₹620
- B. ₹820
- C. ₹920
- D. ₹720 (Correct)
Explanation: Work ratio A:B = 3/12:3/18 = 18:12. A's wage = 1200×18/(30) = 720. / काम अनुपात A:B = 3/12:3/18 = 18:12. A का वेतन = 1200×18/30 = 720.
- Time & Work & Wages — Percentage / प्रतिशत
21. 12% of 525 is: / 525 का 12% कितना है?
- A. 53
- B. 63 (Correct)
- C. 73
- D. 83
Explanation: 12% = 12/100, so answer = 63. / प्रतिशत को 100 से भाग देकर मूल संख्या से गुणा करें।
- Time & Work & Wages — Profit-Loss / लाभ-हानि
22. An article bought for Rs 1000 is sold at 10% profit. Find SP. / Rs 1000 में खरीदी वस्तु 10% लाभ पर बेची गई। SP ज्ञात करें।
- A. Rs 1060
- B. Rs 1100 (Correct)
- C. Rs 1140
- D. Rs 1180
Explanation: SP = CP x (100 + profit%)/100 = 1000 x 110/100 = Rs 1100. / लाभ प्रतिशत जोड़कर विक्रय मूल्य निकालें।
- Time & Work & Wages — Time & Work / समय और कार्य
23. A finishes a work in 18 days and B in 24 days. Together they finish in: / A 18 दिन और B 24 दिन में काम पूरा करते हैं। साथ में समय?
- A. 9.3 days
- B. 10.3 days (Correct)
- C. 11.3 days
- D. 12.3 days
Explanation: Combined time = ab/(a+b) = 18 x 24 / 42 = 10.3 days. / संयुक्त कार्य में दरें जोड़ी जाती हैं।
- Time & Work & Wages — Speed Conversion / चाल परिवर्तन
24. 90 km/h equals: / 90 किमी/घंटा बराबर है:
- A. 22 m/s
- B. 25 m/s (Correct)
- C. 28 m/s
- D. 30 m/s
Explanation: km/h to m/s conversion uses x 5/18. 90 x 5/18 = 25. / किमी/घंटा को मी/से में बदलने के लिए 5/18 से गुणा करें।
- Time & Work & Wages — Simplification / सरलीकरण
25. Simplify: 22 x 13 + 22 - 13. / सरल करें: 22 x 13 + 22 - 13.
- A. 287
- B. 295 (Correct)
- C. 303
- D. 311
Explanation: Apply BODMAS: 286 + 22 - 13 = 295. / पहले गुणा, फिर जोड़-घटाव करें।