Time & Work & Wages Test 7

Bilingual timed test for SSC, RRB and Banking quant with clean Hindi, preserved math symbols and detailed solutions.

Timer-based practiceDetailed answer reviewMobile-friendly flow
Batch 2 | SSC RRB Banking

Time & Work & Wages Test 7

25 bilingual MCQs from Time & Work & Wages, including 5 fresh LearnAtMyPlace original supplemental questions with detailed solutions. Designed for cross-exam quantitative aptitude practice with preserved ₹, ×, %, ratios and Hindi wording.

Questions
25
Duration
25 min
Marking
+1 / -0.25
Sections
Time & Work & Wages | 25 questions

Question Palette Legend

1Not Visited1Not Answered1Answered1Marked for Review1Answered + Marked
Preview all 25 questions in Time & Work & Wages Test 7 (no login required)
  1. Time & Work & Wages — Three workers together

    1. A, B and C can do a work in 13, 19 and 37 days respectively. Find the time taken together. / A, B और C काम को क्रमशः 13, 19, 37 दिनों में करते हैं। तीनों मिलकर समय ज्ञात करें।

    • A. 10570/1431 days
    • B. 7708/1431 days
    • C. 9139/1431 days (Correct)
    • D. 12001/1431 days

    Explanation: Combined rate = 1/13+1/19+1/37; time = 9139/1431 days. / संयुक्त दर = 1/13+1/19+1/37; समय = 9139/1431 days.

  2. Time & Work & Wages — Three workers together

    2. A, B and C can do a work in 14, 20 and 38 days respectively. Find the time taken together. / A, B और C काम को क्रमशः 14, 20, 38 दिनों में करते हैं। तीनों मिलकर समय ज्ञात करें।

    • A. 3446/393 days
    • B. 2267/393 days
    • C. 3053/393 days
    • D. 2660/393 days (Correct)

    Explanation: Combined rate = 1/14+1/20+1/38; time = 2660/393 days. / संयुक्त दर = 1/14+1/20+1/38; समय = 2660/393 days.

  3. Time & Work & Wages — Work left after one worker

    3. A can finish a work in 13 days and B in 18 days. A works for 7 days and leaves. How many more days will B take? / A काम को 13 दिनों में और B 18 दिनों में करता है। A 7 दिन काम करके चला जाता है। शेष काम B कितने दिनों में करेगा?

    • A. 134/13 days
    • B. 108/13 days (Correct)
    • C. 95/13 days
    • D. 121/13 days

    Explanation: A completes 7/13. Remaining = 6/13. B takes 6/13×18 = 108/13 days. / A ने 7/13 काम किया। शेष = 6/13. B का समय = 6/13×18 = 108/13 days.

  4. Time & Work & Wages — Work left after one worker

    4. A can finish a work in 14 days and B in 19 days. A works for 8 days and leaves. How many more days will B take? / A काम को 14 दिनों में और B 19 दिनों में करता है। A 8 दिन काम करके चला जाता है। शेष काम B कितने दिनों में करेगा?

    • A. 71/7 days
    • B. 64/7 days
    • C. 50/7 days
    • D. 57/7 days (Correct)

    Explanation: A completes 8/14. Remaining = 3/7. B takes 3/7×19 = 57/7 days. / A ने 8/14 काम किया। शेष = 3/7. B का समय = 3/7×19 = 57/7 days.

  5. Time & Work & Wages — Alternate days work

    5. A and B can finish a work in 22 and 28 days. They work on alternate days starting with A. Find total time. / A और B काम को 22 और 28 दिनों में पूरा करते हैं। वे A से शुरू करके alternate days काम करते हैं। कुल समय ज्ञात करें।

    • A. 172/7 days (Correct)
    • B. 186/7 days
    • C. 179/7 days
    • D. 165/7 days

    Explanation: In two days work = 1/22+1/28. Counting cycles and the last partial day gives total time = 172/7 days. / दो दिनों का काम = 1/22+1/28. चक्रों और अंतिम आंशिक दिन से कुल समय = 172/7 days.

  6. Time & Work & Wages — Alternate days work

    6. A and B can finish a work in 24 and 30 days. They work on alternate days starting with A. Find total time. / A और B काम को 24 और 30 दिनों में पूरा करते हैं। वे A से शुरू करके alternate days काम करते हैं। कुल समय ज्ञात करें।

    • A. 133/5 days (Correct)
    • B. 143/5 days
    • C. 138/5 days
    • D. 128/5 days

    Explanation: In two days work = 1/24+1/30. Counting cycles and the last partial day gives total time = 133/5 days. / दो दिनों का काम = 1/24+1/30. चक्रों और अंतिम आंशिक दिन से कुल समय = 133/5 days.

  7. Time & Work & Wages — Efficiency change

    7. A completes a work in 27 days. If efficiency increases by 25%, find new time. / A काम को 27 दिनों में करता है। यदि दक्षता 25% बढ़े, तो नया समय ज्ञात करें।

    • A. 103/5 days
    • B. 108/5 days (Correct)
    • C. 113/5 days
    • D. 118/5 days

    Explanation: Time is inversely proportional to efficiency. New time = 27×100/125 = 108/5 days. / समय दक्षता के व्युत्क्रमानुपाती है। नया समय = 27×100/125 = 108/5 days.

  8. Time & Work & Wages — Efficiency change

    8. A completes a work in 28 days. If efficiency increases by 25%, find new time. / A काम को 28 दिनों में करता है। यदि दक्षता 25% बढ़े, तो नया समय ज्ञात करें।

    • A. 107/5 days
    • B. 117/5 days
    • C. 122/5 days
    • D. 112/5 days (Correct)

    Explanation: Time is inversely proportional to efficiency. New time = 28×100/125 = 112/5 days. / समय दक्षता के व्युत्क्रमानुपाती है। नया समय = 28×100/125 = 112/5 days.

  9. Time & Work & Wages — Partial wage sharing

    9. A can complete work in 19 days, B in 24 days. A works 5 days and B works 7 days. Total wage is ₹5900. Find A's share. / A काम को 19 दिनों में और B 24 दिनों में करता है। A 5 दिन और B 7 दिन काम करते हैं। कुल मजदूरी ₹5900 है। A का हिस्सा ज्ञात करें।

    • A. ₹2798 (Correct)
    • B. ₹3198
    • C. ₹2998
    • D. ₹2598

    Explanation: Wage ratio A:B = (5/19):(7/24) = 120:133. A's share = ₹2798. / वेतन अनुपात A:B = (5/19):(7/24) = 120:133. A का हिस्सा = ₹2798.

  10. Time & Work & Wages — Partial wage sharing

    10. A can complete work in 10 days, B in 25 days. A works 5 days and B works 7 days. Total wage is ₹6000. Find A's share. / A काम को 10 दिनों में और B 25 दिनों में करता है। A 5 दिन और B 7 दिन काम करते हैं। कुल मजदूरी ₹6000 है। A का हिस्सा ज्ञात करें।

    • A. ₹3646
    • B. ₹4046
    • C. ₹3846 (Correct)
    • D. ₹4246

    Explanation: Wage ratio A:B = (5/10):(7/25) = 25:14. A's share = ₹3846. / वेतन अनुपात A:B = (5/10):(7/25) = 25:14. A का हिस्सा = ₹3846.

  11. Time & Work & Wages — Three workers together

    11. A, B and C can do a work in 23, 29 and 29 days respectively. Find the time taken together. / A, B और C काम को क्रमशः 23, 29, 29 दिनों में करते हैं। तीनों मिलकर समय ज्ञात करें।

    • A. 817/75 days
    • B. 742/75 days
    • C. 592/75 days
    • D. 667/75 days (Correct)

    Explanation: Combined rate = 1/23+1/29+1/29; time = 667/75 days. / संयुक्त दर = 1/23+1/29+1/29; समय = 667/75 days.

  12. Time & Work & Wages — Three workers together

    12. A, B and C can do a work in 12, 30 and 30 days respectively. Find the time taken together. / A, B और C काम को क्रमशः 12, 30, 30 दिनों में करते हैं। तीनों मिलकर समय ज्ञात करें।

    • A. 23/3 days
    • B. 20/3 days (Correct)
    • C. 26/3 days
    • D. 17/3 days

    Explanation: Combined rate = 1/12+1/30+1/30; time = 20/3 days. / संयुक्त दर = 1/12+1/30+1/30; समय = 20/3 days.

  13. Time & Work & Wages — Work left after one worker

    13. A can finish a work in 13 days and B in 28 days. A works for 7 days and leaves. How many more days will B take? / A काम को 13 दिनों में और B 28 दिनों में करता है। A 7 दिन काम करके चला जाता है। शेष काम B कितने दिनों में करेगा?

    • A. 181/13 days
    • B. 168/13 days (Correct)
    • C. 194/13 days
    • D. 155/13 days

    Explanation: A completes 7/13. Remaining = 6/13. B takes 6/13×28 = 168/13 days. / A ने 7/13 काम किया। शेष = 6/13. B का समय = 6/13×28 = 168/13 days.

  14. Time & Work & Wages — Work left after one worker

    14. A can finish a work in 14 days and B in 29 days. A works for 8 days and leaves. How many more days will B take? / A काम को 14 दिनों में और B 29 दिनों में करता है। A 8 दिन काम करके चला जाता है। शेष काम B कितने दिनों में करेगा?

    • A. 94/7 days
    • B. 101/7 days
    • C. 87/7 days (Correct)
    • D. 80/7 days

    Explanation: A completes 8/14. Remaining = 3/7. B takes 3/7×29 = 87/7 days. / A ने 8/14 काम किया। शेष = 3/7. B का समय = 3/7×29 = 87/7 days.

  15. Time & Work & Wages — Alternate days work

    15. A and B can finish a work in 26 and 32 days. They work on alternate days starting with A. Find total time. / A और B काम को 26 और 32 दिनों में पूरा करते हैं। वे A से शुरू करके alternate days काम करते हैं। कुल समय ज्ञात करें।

    • A. 245/8 days
    • B. 229/8 days (Correct)
    • C. 237/8 days
    • D. 221/8 days

    Explanation: In two days work = 1/26+1/32. Counting cycles and the last partial day gives total time = 229/8 days. / दो दिनों का काम = 1/26+1/32. चक्रों और अंतिम आंशिक दिन से कुल समय = 229/8 days.

  16. Time & Work & Wages — Alternate days work

    16. A and B can finish a work in 12 and 18 days. They work on alternate days starting with A. Find total time. / A और B काम को 12 और 18 दिनों में पूरा करते हैं। वे A से शुरू करके alternate days काम करते हैं। कुल समय ज्ञात करें।

    • A. 46/3 days
    • B. 43/3 days (Correct)
    • C. 49/3 days
    • D. 40/3 days

    Explanation: In two days work = 1/12+1/18. Counting cycles and the last partial day gives total time = 43/3 days. / दो दिनों का काम = 1/12+1/18. चक्रों और अंतिम आंशिक दिन से कुल समय = 43/3 days.

  17. Time & Work & Wages — Efficiency change

    17. A completes a work in 27 days. If efficiency increases by 25%, find new time. / A काम को 27 दिनों में करता है। यदि दक्षता 25% बढ़े, तो नया समय ज्ञात करें।

    • A. 103/5 days
    • B. 118/5 days
    • C. 108/5 days (Correct)
    • D. 113/5 days

    Explanation: Time is inversely proportional to efficiency. New time = 27×100/125 = 108/5 days. / समय दक्षता के व्युत्क्रमानुपाती है। नया समय = 27×100/125 = 108/5 days.

  18. Time & Work & Wages — Efficiency change

    18. A completes a work in 28 days. If efficiency increases by 25%, find new time. / A काम को 28 दिनों में करता है। यदि दक्षता 25% बढ़े, तो नया समय ज्ञात करें।

    • A. 112/5 days (Correct)
    • B. 107/5 days
    • C. 122/5 days
    • D. 117/5 days

    Explanation: Time is inversely proportional to efficiency. New time = 28×100/125 = 112/5 days. / समय दक्षता के व्युत्क्रमानुपाती है। नया समय = 28×100/125 = 112/5 days.

  19. Time & Work & Wages — Partial wage sharing

    19. A can complete work in 19 days, B in 22 days. A works 5 days and B works 7 days. Total wage is ₹6900. Find A's share. / A काम को 19 दिनों में और B 22 दिनों में करता है। A 5 दिन और B 7 दिन काम करते हैं। कुल मजदूरी ₹6900 है। A का हिस्सा ज्ञात करें।

    • A. ₹2923
    • B. ₹3323
    • C. ₹3123 (Correct)
    • D. ₹3523

    Explanation: Wage ratio A:B = (5/19):(7/22) = 110:133. A's share = ₹3123. / वेतन अनुपात A:B = (5/19):(7/22) = 110:133. A का हिस्सा = ₹3123.

  20. Time & Work & Wages — Partial wage sharing

    20. A can complete work in 10 days, B in 23 days. A works 5 days and B works 7 days. Total wage is ₹5000. Find A's share. / A काम को 10 दिनों में और B 23 दिनों में करता है। A 5 दिन और B 7 दिन काम करते हैं। कुल मजदूरी ₹5000 है। A का हिस्सा ज्ञात करें।

    • A. ₹3308
    • B. ₹2908
    • C. ₹3108 (Correct)
    • D. ₹3508

    Explanation: Wage ratio A:B = (5/10):(7/23) = 23:14. A's share = ₹3108. / वेतन अनुपात A:B = (5/10):(7/23) = 23:14. A का हिस्सा = ₹3108.

  21. Time & Work & Wages — Percentage / प्रतिशत

    21. 25% of 400 is: / 400 का 25% कितना है?

    • A. 90
    • B. 100 (Correct)
    • C. 110
    • D. 120

    Explanation: 25% = 25/100, so answer = 100. / प्रतिशत को 100 से भाग देकर मूल संख्या से गुणा करें।

  22. Time & Work & Wages — Profit-Loss / लाभ-हानि

    22. An article bought for Rs 1150 is sold at 20% profit. Find SP. / Rs 1150 में खरीदी वस्तु 20% लाभ पर बेची गई। SP ज्ञात करें।

    • A. Rs 1340
    • B. Rs 1380 (Correct)
    • C. Rs 1420
    • D. Rs 1460

    Explanation: SP = CP x (100 + profit%)/100 = 1150 x 120/100 = Rs 1380. / लाभ प्रतिशत जोड़कर विक्रय मूल्य निकालें।

  23. Time & Work & Wages — Time & Work / समय और कार्य

    23. A finishes a work in 15 days and B in 21 days. Together they finish in: / A 15 दिन और B 21 दिन में काम पूरा करते हैं। साथ में समय?

    • A. 7.800000000000001 days
    • B. 8.8 days (Correct)
    • C. 9.8 days
    • D. 10.8 days

    Explanation: Combined time = ab/(a+b) = 15 x 21 / 36 = 8.8 days. / संयुक्त कार्य में दरें जोड़ी जाती हैं।

  24. Time & Work & Wages — Speed Conversion / चाल परिवर्तन

    24. 72 km/h equals: / 72 किमी/घंटा बराबर है:

    • A. 17 m/s
    • B. 20 m/s (Correct)
    • C. 23 m/s
    • D. 25 m/s

    Explanation: km/h to m/s conversion uses x 5/18. 72 x 5/18 = 20. / किमी/घंटा को मी/से में बदलने के लिए 5/18 से गुणा करें।

  25. Time & Work & Wages — Simplification / सरलीकरण

    25. Simplify: 26 x 16 + 26 - 16. / सरल करें: 26 x 16 + 26 - 16.

    • A. 418
    • B. 426 (Correct)
    • C. 434
    • D. 442

    Explanation: Apply BODMAS: 416 + 26 - 16 = 426. / पहले गुणा, फिर जोड़-घटाव करें।