RRB NTPC/
RRB NTPC Time-Work Bilingual Test 20
Bilingual Chapter Drill

RRB NTPC Time-Work Bilingual Test 20

Time & Work / समय और कार्य practice in Hindi-English with original RRB NTPC style questions, timer, negative marking and explanation review.

Timer-based practiceDetailed answer reviewMobile-friendly flow
RRB NTPC Chapter Test

RRB NTPC Time-Work Bilingual Test 20

Efficiency, combined work, pipes and man-days. Test 20 contains original bilingual RRB NTPC style questions with explanations. Use it as a short railway CBT drill: solve, submit, review every explanation, then move to the next set.

Questions
18
Duration
20 min
Marking
+1 / -0.33 (Max 18)
Sections
Time & Work / समय और कार्य | 18 questions

Question Palette Legend

1Not Visited1Not Answered1Answered1Marked for Review1Answered + Marked
Preview all 18 questions in RRB NTPC Time-Work Bilingual Test 20 (no login required)
  1. Mathematics / गणित — Combined Work

    1. A in 15 days, B in 30 days. Together? / A 15 दिन, B 30 दिन। साथ में?

    • A. 8
    • B. 10 (Correct)
    • C. 12
    • D. 15

    Explanation: Rate = 1/15 + 1/30 = 1/10. / संयुक्त दर।

  2. Mathematics / गणित — Efficiency

    2. Efficiency A:B = 4:3, together 14 days. A alone? / दक्षता 4:3, साथ में 14 दिन। A अकेला?

    • A. 20.5
    • B. 22.5
    • C. 24.5 (Correct)
    • D. 26.5

    Explanation: Work = 7 x 14 = 98; A time = 98/4 = 24.5. / दक्षता विधि।

  3. Mathematics / गणित — Pipes

    3. Two pipes fill in 12h and 24h. Together? / पाइप 12h और 24h में भरते हैं। साथ में?

    • A. 6h
    • B. 8h (Correct)
    • C. 9h
    • D. 10h

    Explanation: Rate = 1/12 + 1/24 = 1/8. / संयुक्त दर।

  4. Mathematics / गणित — Work Left

    4. A finishes in 18 days. Work left after 6 days? / 18 दिन में कार्य, 6 दिन बाद शेष?

    • A. 1/3
    • B. 1/2
    • C. 2/3 (Correct)
    • D. 3/4

    Explanation: Done 6/18 = 1/3, left 2/3. / शेष।

  5. Mathematics / गणित — Man-days

    5. 15 workers finish in 12 days. 20 workers finish in? / 15 मजदूर 12 दिन, 20 मजदूर?

    • A. 8
    • B. 9 (Correct)
    • C. 10
    • D. 11

    Explanation: Worker-days = 180, days = 180/20 = 9. / मानव-दिन।

  6. Quantitative Aptitude / मात्रात्मक योग्यता — Combined Work / संयुक्त कार्य

    6. A completes a work in 12 days and B in 18 days. Find time together. / A कार्य 12 दिन में और B 18 दिन में करता है। साथ में समय?

    • A. 6.8 days
    • B. 7.2 days (Correct)
    • C. 8 days
    • D. 9 days

    Explanation: Rate = 1/12 + 1/18 = 5/36, so time = 36/5 = 7.2 days. / कार्य-दर जोड़ें।

  7. Quantitative Aptitude / मात्रात्मक योग्यता — Efficiency / दक्षता

    7. A:B efficiency = 3:2. Together finish in 10 days. A alone takes: / A:B दक्षता 3:2 है। साथ में 10 दिन लगते हैं। A अकेला?

    • A. 15 days
    • B. 16.67 days (Correct)
    • C. 20 days
    • D. 25 days

    Explanation: Total work = 5 x 10 = 50 units; A time = 50/3 = 16.67. / दक्षता विधि लगाएँ।

  8. Quantitative Aptitude / मात्रात्मक योग्यता — Pipes / पाइप

    8. A fills a tank in 10 h and B empties it in 20 h. Net filling time? / A टंकी 10 h में भरता है और B 20 h में खाली करता है। कुल समय?

    • A. 10 h
    • B. 15 h
    • C. 20 h (Correct)
    • D. 25 h

    Explanation: Net rate = 1/10 - 1/20 = 1/20. / भरने और खाली करने की दर घटाएँ।

  9. Quantitative Aptitude / मात्रात्मक योग्यता — Man-days / मानव-दिन

    9. 8 workers finish work in 15 days. 12 workers finish it in: / 8 मजदूर 15 दिन में कार्य करते हैं। 12 मजदूर कितने दिन लेंगे?

    • A. 8
    • B. 10 (Correct)
    • C. 12
    • D. 14

    Explanation: Worker-days = 8 x 15 = 120; days = 120/12 = 10. / मानव-दिन समान रहते हैं।

  10. Quantitative Aptitude / मात्रात्मक योग्यता — Work Left / शेष कार्य

    10. A can finish work in 18 days. Work left after 6 days is: / A कार्य 18 दिन में करता है। 6 दिन बाद शेष कार्य?

    • A. 1/3
    • B. 1/2
    • C. 2/3 (Correct)
    • D. 3/4

    Explanation: Done = 6/18 = 1/3, so left = 2/3. / किया गया भाग घटाएँ।

  11. Quantitative Aptitude / मात्रात्मक योग्यता — Wages / मजदूरी

    11. A and B earn Rs 900 in work ratio 4:5. Find B's share. / A और B Rs 900 को कार्य अनुपात 4:5 में बाँटते हैं। B का हिस्सा?

    • A. Rs 400
    • B. Rs 450
    • C. Rs 500 (Correct)
    • D. Rs 550

    Explanation: B share = 5/9 x 900 = 500. / मजदूरी कार्य अनुपात में बँटती है।

  12. Quantitative Aptitude / मात्रात्मक योग्यता — Alternate Days / वैकल्पिक दिन

    12. A can do a work in 10 days and B in 15 days. Working on alternate days starting with A, work finishes in: / A 10 दिन और B 15 दिन में कार्य करता है। A से शुरू कर बारी-बारी काम करने पर समय?

    • A. 11 days
    • B. 12 days (Correct)
    • C. 13 days
    • D. 14 days

    Explanation: In 2 days work done = 1/10 + 1/15 = 1/6; total time = 12 days. / 2-दिन का चक्र 1/6 कार्य करता है।

  13. Quantitative Aptitude / मात्रात्मक योग्यता — Pipe Filling / पाइप भरना

    13. Two pipes fill a tank in 12 h and 24 h. Together they fill it in: / दो पाइप 12 h और 24 h में टंकी भरते हैं। साथ में समय?

    • A. 6 h
    • B. 8 h (Correct)
    • C. 9 h
    • D. 10 h

    Explanation: Rate = 1/12 + 1/24 = 1/8. / संयुक्त दर 1/8 है।

  14. Quantitative Aptitude / मात्रात्मक योग्यता — Efficiency Ratio / दक्षता अनुपात

    14. A is twice as efficient as B. Together they finish in 12 days. B alone takes: / A, B से दोगुना दक्ष है। दोनों 12 दिन में कार्य करते हैं। B अकेला?

    • A. 24 days
    • B. 30 days
    • C. 36 days (Correct)
    • D. 40 days

    Explanation: Efficiencies 2:1; total work = 3 x 12 = 36 units, B time = 36. / B की दक्षता 1 इकाई है।

  15. Quantitative Aptitude / मात्रात्मक योग्यता — Work Fraction / कार्य भिन्न

    15. If A completes 1/5 of work in one day, he completes whole work in: / A एक दिन में 1/5 कार्य करता है। पूरा कार्य कितने दिन में?

    • A. 3
    • B. 4
    • C. 5 (Correct)
    • D. 6

    Explanation: Time is reciprocal of one-day work = 5 days. / दर का व्युत्क्रम लें।

  16. Quantitative Aptitude / मात्रात्मक योग्यता — Leakage / रिसाव

    16. A pipe fills a tank in 8 h. A leak empties it in 24 h. Net filling time is: / पाइप 8 h में भरता है और रिसाव 24 h में खाली करता है। कुल समय?

    • A. 10 h
    • B. 12 h (Correct)
    • C. 14 h
    • D. 16 h

    Explanation: Net rate = 1/8 - 1/24 = 1/12. / दर घटाएँ।

  17. Quantitative Aptitude / मात्रात्मक योग्यता — Team Work / दल कार्य

    17. A, B and C can do work in 12, 15 and 20 days. Together they take: / A, B, C कार्य 12, 15, 20 दिन में करते हैं। साथ में समय?

    • A. 4 days
    • B. 5 days (Correct)
    • C. 6 days
    • D. 7 days

    Explanation: Rate = 1/12 + 1/15 + 1/20 = 1/5. / संयुक्त दर 1/5 है।

  18. Quantitative Aptitude / मात्रात्मक योग्यता — Work Rate / कार्य दर

    18. If 6 men do a work in 8 days, how many man-days are needed? / 6 व्यक्ति 8 दिन में कार्य करते हैं। कितने मानव-दिन लगेंगे?

    • A. 36
    • B. 42
    • C. 48 (Correct)
    • D. 56

    Explanation: Man-days = 6 x 8 = 48. / व्यक्ति x दिन करें।